Floor G Houldsworth Hulme Hall Oxford Place Manchester M14 5RR
Installation of two cross corridor doors on the first floor of Houldsworth Hall, and the treatment of timber fire resistant doors on the ground floor and first floor with intumescent coating.
Received 13 Mar 2026
Agent
Shown in Metis
Applicant
Shown in Metis